B2B Sourcing Platform

SOURCE AUTOMOTIVE WIRE HARNESSES.

Stop emailing PDFs to unresponsive black holes. Submit your drawings once. Reach validated Tier 1 and Tier 2 assembly partners globally.

450+ Validated Suppliers
LV214 / USCAR Compliant Partners

THE SOURCING BOTTLENECK

Procurement teams spend an average of 45 days qualifying a new cable assembly supplier. Engineering teams lose weeks modifying drawings to match regional supplier capabilities.

We reverse the dynamic. Define your technical requirements once, and let validated suppliers bid based on raw material availability and line capacity.

3.2M+

Meters of Cable Quoted Weekly

From standard TXL/GXL to high-voltage shielded silicone cables for EV architectures, our network covers the full spectrum of USCAR and LV214 requirements.

14 Days

Average Time to First Article (FAI)

By routing RFQs to suppliers with existing tooling for your specified connectors (TE, Molex, Yazaki, Aptiv), we eliminate 4-6 weeks of tool-up lead time.

ISO/TS 16949

Baseline Requirement

Every supplier in our network holds active automotive quality certifications. We audit their IMDS compliance and PPAP generation capabilities before they see a single drawing.

RFQ WORKFLOW

Structured data capture ensures suppliers quote apples-to-apples, eliminating the back-and-forth of incomplete requirements.

01

Technical Intake

  • > Upload 2D/3D (PDF, IGES)
  • > Define BOM / AVL
  • > Specify tolerances
  • > Set environmental class
02

Program Metrics

  • > EAU (Estimated Annual Usage)
  • > PPAP Level required
  • > Target cost
  • > SOP date (Start of Production)
03

Algorithmic Routing

  • > Match machine capabilities
  • > Verify regional preferences
  • > Check current line capacity
  • > Filter by active certifications
04

Bid Normalization

  • > Raw material breakdown
  • > Value-add labor split
  • > Tooling amortization
  • > Logistics factoring

Our network processes components from leading manufacturers

TE.CONN
M.LEX
YAZ.SYS
APT.ARCH
HELL.TY